Beenleigh steel

 

fabrications pty ltd

Australian industry leader

 

(07) 3440 1500

300 George Street

An $800M re-purposing of 300 George Street: 3 ultra-modern mixed-use glass towers atop a 3-storey podium – designed to dazzle and dominate the Brisbane city skyline.

First to be constructed is the 5-star, 32-storey hotel; pivotal, as it will connect the podium to the two larger towers (a commercial tower and whopping 82-level residential tower to be built in later stages). With its reflective curvilinear façade, it will include 305 rooms, a lobby bar, resort shop, presidential and executive suites, with the whole top floor devoted to a pool deck with spa, large pool, family pool, bar and health spa.

The 3-storey podium will feature a retail shopping mall, restaurants, bars, cafes, business centre and a master ballroom. The top level of the podium will boast an impressive multi-featured recreational zone with sculptural artworks, water feature, amphitheatre, jacaranda gardens and viewing platform. An ample seven-level basement car park has also been incorporated into this massive redevelopment.

Managing contractor, Multiplex has once again called on BSF’s expertise to fabricate and erect over 150 tonne of steelwork for Phases 1 & 2 of the hotel tower which is currently under construction.

Artist’s impressions